Aging work
Not in Jira"Two tickets are older than 85% of what this team ever finishes."
- Compared with
- Tickets your team finished in the last 90 days
- Speaks up when
- An open ticket is older than 85% of them
No thresholds to tune
"Too long" comes from your history, not a settings screen.
Your own history
Never an industry benchmark or a league table.
Team-level only
Baro never names a person.
Read-only
Baro never writes to Jira.
Signals
Each one is a sentence Baro writes from your numbers. "Too long" and "too many" come from what your own team finishes, never from a number you set.
Shows you this sprint.
Burndown, velocity and the sprint report: one sprint at a time, with thresholds you set yourself.
Tells you whether it keeps happening.
Signals no Jira report shows, each judged against your own history, with nothing to configure.
"Two tickets are older than 85% of what this team ever finishes."
"PLT-355 is on its third sprint. PLT-371 was reopened after being closed."
"Four tickets moved to In Progress on day 12 of 14."
"In progress, not blocked, and no update in longer than usual for this team."
"8 points added mid-sprint: 3 interrupts (3 bugs), 5 pulled from backlog. Re-estimated: +3 up, −2 down."
"Blocked time is trending up: 12% in Sprint 23, vs a trailing average of 8%."
"This sprint is behind, and it has happened before. 2 of your last 6 sprints came in under plan. Work added after the sprint started shows up in most of them."
"13% of Sprint 23's delivered points were re-doing previously done work."
"26% of your finished tickets skipped the board's normal path, so timing numbers are partly trusted."
How it decides
There is no setting for "too long" or "too many". Each signal is a written rule that compares this ticket or this sprint with something your own team has already done. Same data in, same sentence out.
Your history is the yardstick
"Too long" is measured against tickets your team finished. "Keeps happening" is measured against your last six sprints.
Your sprint is the clock
Time rules use a share of the sprint, not a day count. A one-week and a four-week sprint get the same rule.
Too little data, no call
Under 3 finished sprints, Baro says there is not enough history to tell yet, and how many sprints it still needs. It never fills the gap with a guess.
Written by rules
Refresh twice, get the same answer. Every brief has a "How we decide" note, and each signal card above shows its rule.
One rule, worked through
Half of your tickets finish within 3 days, 85% within 7.
Finished in the last 90 days, by days from start to done
Open right now, by age
Two tickets are older than 85% of what this team ever finishes.
Starting bar
Six targets, so Team health has something to say on the first refresh. They are Baro's reference for a good team, not an industry standard, and they are the six Baro measures from Jira alone: the three faders without data on the card above (review time, rubber-stamp reviews, PRs linked to a ticket) need a code host and stay dark until one is connected. Change any of them on the Bar tab, and Baro labels the bar as yours.
Cycle time
Flow
How long a ticket takes from start to done. Where blocked time, waiting and rework hide.
8 days
lower is better
Rework rate
Flow
Share of status changes that move a ticket backward, such as QA back to In Progress.
10%
lower is better
Planned vs delivered
Delivery
Points delivered against points committed at sprint start. This is predictability.
80%
higher is better
Work-type concentration
Silos
The largest share of one kind of work, such as bug fixes, done by a small part of the team. Shown as a shape, never a name.
65%
lower is better
Component concentration
Silos
The largest share of one Jira component's tickets done by a small part of the team. Shown as a shape, never a name.
50%
lower is better
Thin acceptance criteria
Refinement
Stories far thinner than your own stories of a similar size. They bounce back from QA and carry over.
15%
lower is better
How a verdict is reached
Within 10% of a target counts as at bar. The band is editable too, from 1% to 50%. Presets move every target at once: the starting bar, your last three sprints, or a 10% stretch.
No target on purpose
Throughput and review queue depend on team size. A good number for three people is a bad one for nine, so Baro compares them only with your own earlier periods.
Honest by default
It says what it worked out. Nothing to map. Settings exists to override, never to unlock.
It marks a rough number. The badge sits on every timing card your board history weakens.
It leaves a gap instead of guessing. Trends fill in as sprints finish.
We're letting teams in a few at a time. Scrum teams first. Kanban teams get flow metrics. Works with Jira Cloud; Jira Server and Data Center aren't supported yet.